Hennepin Av. between Douglas Av. and W. 31st St. will undergo reconstruction in 2024 to better suit the needs of pedestrians, bicycle traffic, transit and cars. Enhanced transit stops for the future Metro E Line BRT and replacement of traffic signals and stormwater infrastructure are also planned.