Status of the three tie-in sites:
Shaganappi Pump Station (near Edworthy Park): Excavation substantially complete; pipe exposed for tie-in preparation.
33 Ave. & 89 St. NW: Excavation complete; preparing to install the new valve.
33 & 34 Ave. at 83 St. NW: Excavation complete; pipe installation has started.