Figure 8: Data Center Projected Annual Energy Use in Terawatt Hours - Low Growth Scenario (2026)

This figure was adapted from the Electric Power Research Institute’s dashboard “State-Level Data Center Power Data" published in February 2026. A low growth scenario is defined by the Electric Power Research Institute as assuming "most projects under construction and 1/4 of those in advanced planning are fully operational by 2030."