... and cost by 2035, with and without reconductoring


*Transmission buildout rate is assumed to be restricted to the historical average.
Source: E. Chojkiewicz, U. Paliwal, N. Abhyankar, C. Baker, R. O’Connell, D. Callaway, and A. Phadke, “Accelerating Transmission Expansion by Using Advanced Conductors in Existing Right-of-Way” (Revised February 2024) | WP-343R Embed
Heatmap