John Nolen Drive Reconstruction Phases

Phase 1: Lakeside Street to Broom Street, Fall 2025 to Summer 2027. Phase 2: Olin Avenue to Lakeside Street, Spring 2028 to Fall 2029. Phase 3: Beltline to Olin Avenue, Spring 2029 to Fall 2029.