Proposed 2015 superhighway route

Proposed route for the six-lane superhighway in 2015 which threatened to rip through 52km of Ekuri community and the heart of Cross River National Park. Thanks to public pressure, a new route was proposed in 2017 which largely avoided the Ekuri villages before being abandoned.